Build Better.

Build GDeck.

Our ultra-light, high-performance floors save time, reduce costs, and raise standards on every site.

GDeck® isn’t just another flooring system – it’s a smarter, lighter, faster way to build from the ground floor up. Designed for strength, speed, and exceptional thermal performance, GDeck delivers everything today’s housebuilder and Groundworker need to get the job done, better.

Architects

Removing unnecessary steps, reducing risk, and delivering a system that’s faster, stronger, and lighter than traditional beam and block with topsheet installation.

Groundworker

Removing unnecessary steps, reducing risk, and delivering a system that’s faster, stronger, and lighter than traditional beam and block with topsheet installation.

Housebuilders

Removing unnecessary steps, reducing risk, and delivering a system that’s faster, stronger, and lighter than traditional beam and block with topsheet installation.

SAP Assessors

Our role is to partner with architects early, ensuring that every specification delivers design integrity, feasibility, and cost-effectiveness.

Regulatory

By working with us, you gain a technical ally dedicated to turning your concept into a compliant, buildable, and sustainable solution.

How does GDeck perform against Topsheet and Beam & Block?

GDeck outperforms traditional beam and block, top sheet systems, and insulated precast units by delivering:

Lighter: ~200 kg/m² less dead load. Faster install: Around 2 days vs. 1+ weeks for some systems. Lower cost per m²: Significant savings on materials, labour, and waste removal. Better U-values: Achieved at point of design for guaranteed SAP compliance. Less waste: Minimal offcuts, all recyclable.

FeatureGDeck – Faster, stronger, lighterBeam and block and top sheet
Installation speed No additional top sheet insulation requiredSlower and heavier installs
Thermal performanceMoulded panels provide excellent insulation and air tightnessAdditional hand cut top sheet insulation required
WasteAny offcuts are used in the floor designHigher due to random cutting of top sheet insulation
LabourNo second installation of top sheet requiredMore time and complexity to install
U-ValuesAs low as 0.09 W/m²K, confirmed at quotationRequires extra layers to match GDeck efficiency
CostFewer panels, less labour and faster buildAdditional insulation layers and slower install
SafetyPanels are attached to the beamLoose top sheets blow across site
SustainabilityInfinitely recyclable panels seperated from concrete toppingMore material waste and landfill impact

Build Smarter.
Build with GDeck.

Request a Quote

Fill in the form below and we’ll get back to you - usually within 48 hours - with the details, drawings, and numbers you need to get started.