GDeck® isn’t just another flooring system – it’s a smarter, lighter, faster way to build from the ground floor up. Designed for strength, speed, and exceptional thermal performance, GDeck delivers everything today’s housebuilder and Groundworker need to get the job done, better.
Removing unnecessary steps, reducing risk, and delivering a system that’s faster, stronger, and lighter than traditional beam and block with topsheet installation.
Removing unnecessary steps, reducing risk, and delivering a system that’s faster, stronger, and lighter than traditional beam and block with topsheet installation.
Removing unnecessary steps, reducing risk, and delivering a system that’s faster, stronger, and lighter than traditional beam and block with topsheet installation.

Our role is to partner with architects early, ensuring that every specification delivers design integrity, feasibility, and cost-effectiveness.

By working with us, you gain a technical ally dedicated to turning your concept into a compliant, buildable, and sustainable solution.
Lighter: ~200 kg/m² less dead load. Faster install: Around 2 days vs. 1+ weeks for some systems. Lower cost per m²: Significant savings on materials, labour, and waste removal. Better U-values: Achieved at point of design for guaranteed SAP compliance. Less waste: Minimal offcuts, all recyclable.
| Feature | GDeck – Faster, stronger, lighter | Beam and block and top sheet |
|---|---|---|
| Installation speed | No additional top sheet insulation required | Slower and heavier installs |
| Thermal performance | Moulded panels provide excellent insulation and air tightness | Additional hand cut top sheet insulation required |
| Waste | Any offcuts are used in the floor design | Higher due to random cutting of top sheet insulation |
| Labour | No second installation of top sheet required | More time and complexity to install |
| U-Values | As low as 0.09 W/m²K, confirmed at quotation | Requires extra layers to match GDeck efficiency |
| Cost | Fewer panels, less labour and faster build | Additional insulation layers and slower install |
| Safety | Panels are attached to the beam | Loose top sheets blow across site |
| Sustainability | Infinitely recyclable panels seperated from concrete topping | More material waste and landfill impact |