Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Removing unnecessary steps, reducing risk, and delivering a system that’s faster, stronger, and lighter than traditional beam and block with topsheet installation.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Our role is to partner with architects early, ensuring that every specification delivers design integrity, feasibility, and cost-effectiveness.

By working with us, you gain a technical ally dedicated to turning your concept into a compliant, buildable, and sustainable solution.

Quicker for Groundworkers to install than Beam and Block or Topsheet systems - up to 30% faster. No top sheet or grouting between beams needed.

All suspend floors resist load with the material between the screed and the top of the beam. High-density EPS rails (min EPS200) are generally twice resistance to long term compression than most Topsheets (Typically EPS 120).

Weighting only 2.4kg per panel, Gdeck is 98% lighter than traditional blocks.

Lower material, labour, and insulation costs result in reduced overall cost to install a ground floor.

Made with recycled EPS. Gdeck EPS component are never contaminated by the screed pour making separating insulation at the end of life of the building easy.
Our clients trust us to bring their visions to life. We prioritize customer satisfaction and ensure that every project meets and exceeds expectations.